Italian - ItalyFrench (Fr)English (United Kingdom)

TECHNICAL REQUIREMENTS

The show can take place outdoors in a calm and intimate place, in a marquee, in a theatre. The technical requirement are simple but some of them, such as the nature of the ground, are necessary to guarantee the safety of the artists.

 

STAGE

Minimum surface is 7x8m, flat ground. Dusty or sloping surfaces should be avoided. The company has a  self-bearing structure (design and approval Hissel s.r.l) that requires a 5,5m minimum headroom. Spaces with lower headroom (never less than 5m) can be catered for but will require two attachement points for a fixed trapeze CMU.WLL. 210daN (maximum load).
 

POWER SUPPLY

The show needs a raccordo monofase (220V). Three 16A sockets are required, one for the PA and the two for the lights.

ASSEMBLING TIME

3 hours, to be executed minimum 4 hours before the show. It is preferable that the company arrives at the venue in the morning, or the evening before in case of matinees. The stage should be accessible to vehicles in order to load and unload materials.
Disassembling time: 2 hrs


The company in normally considerate of the space they perform in.

 

alt